Method for repeated hydraulic fracturing including creation of geomechanical barrier in the interval of the old previously created fracture from the previous hydraulic fracturing
2023-04-20
专利权人LUKOIL-ENG LLC (LUKO-Non-standard) ; LUKOIL WESTERN SIBERIA LLC (LUKO-Soviet Institute)
申请日期2023-04-20
专利号RU2829527-C2
成果简介NOVELTY - Invention relates to oil industry. In the method of repeated hydraulic fracturing of hydraulic fracturing formation, including creation of geomechanical barrier in the interval of the old previously created fracture from the previous hydraulic fracturing, which worked out its resource, by pumping into the specified interval of colmatage composition and its subsequent process sedimentation, performing hydraulic fracturing, forming a new fracture or fractures in sections of the formation, previously not involved or weakly involved in the development process, the colmatage composition is pumped in volumes from 10 to 1500 m3 depending on injectivity index of formation wells at stepwise increase of injection pressure to pressure exceeding pressure of hydraulic fracturing, performing opening and filling the volume of said old hydraulic fracture with a colmatating composition, plugging the formation rock matrix and proppant packing of said old hydraulic fracture. Process settling time - the time required to close the said old hydraulic fracture - makes 2 to 10 hours. Hydraulic fracturing is performed throughout the section with proppant weight from 3 to 10 t per meter of perforated thickness. Colmatage composition used is a suspension composition with an increasing concentration of the main substance in the concentration range from 1 to 3% or polymer composition with increasing concentration of polymer base in concentration range from 1 to 5% and with increasing concentration of cross-linking agent in concentration range from 0.1 to 0.5%. USE - Oil, gas and coke-chemical industry. ADVANTAGE - Increased degree of oil and gas reserves recovery, increased profitable period of operating production wells, commissioning of idle stock of wells stopped due to high water content of the produced product, increased rate of oil extraction, increased oil recovery factor. 1 cl, 4 dwg, 1 tbl, 2 ex
IPC 分类号E21B-033/138 ; E21B-043/267
国家俄罗斯
专业领域化学化工
语种英语
成果类型专利
文献类型科技成果
条目标识符http://119.78.100.226:8889/handle/3KE4DYBR/21993
专题中国科学院新疆生态与地理研究所
作者单位
1.LUKOIL-ENG LLC (LUKO-Non-standard)
2.LUKOIL WESTERN SIBERIA LLC (LUKO-Soviet Institute)
推荐引用方式
GB/T 7714
BUKHAROV A V,MALSHAKOV E N,SHABELIANSKII V A,et al. Method for repeated hydraulic fracturing including creation of geomechanical barrier in the interval of the old previously created fracture from the previous hydraulic fracturing. RU2829527-C2[P]. 2023.
条目包含的文件
条目无相关文件。
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。