| Method for specifying amount of drained reserves using pressure monitoring data during long-term shutdowns of production facilities, involves performing assessment of drained reserves on adapted GDM for calculating GDM, and obtaining extracted reserves as drained gas reserves | |
| 2023-06-27 | |
| 专利权人 | GAZPROM DOBYCHA YAMBURG LLC (GAZP-Non-standard) |
| 申请日期 | 2023-06-27 |
| 专利号 | RU2023117048-A |
| 成果简介 | NOVELTY - The method involves comparing reservoir pressure values with calculated reservoir pressure values using hydrodynamic model (HDM), at the beginning of the shutdown period of facility. The regions for adjusting the GDM to the specified results obtained during the MGDIS DKD are identified, while the regions are identified by filtration zones in accordance with the principles of flow differentiation. The values of modifiers of the initial values of pore volume and permeability of the production formation are selected. The assessment of the drained reserves on the adapted GDM, is performed for calculating the GDM until the end of development, and the extracted reserves are obtained as the drained gas reserves at the end of the calculation. USE - Method for specifying amount of drained reserves using pressure monitoring data during long-term shutdowns of production facilities. |
| IPC 分类号 | E21B-047/06 ; E21B-047/10 |
| 国家 | 俄罗斯 |
| 专业领域 | 信息技术 |
| 语种 | 英语 |
| 成果类型 | 专利 |
| 文献类型 | 科技成果 |
| 条目标识符 | http://119.78.100.226:8889/handle/3KE4DYBR/21489 |
| 专题 | 中国科学院新疆生态与地理研究所 |
| 作者单位 | GAZPROM DOBYCHA YAMBURG LLC (GAZP-Non-standard) |
| 推荐引用方式 GB/T 7714 | GADEEV K V,KASYANENKO A A,KOROBEYNIKOV A V,et al. Method for specifying amount of drained reserves using pressure monitoring data during long-term shutdowns of production facilities, involves performing assessment of drained reserves on adapted GDM for calculating GDM, and obtaining extracted reserves as drained gas reserves. RU2023117048-A[P]. 2023. |
| 条目包含的文件 | 条目无相关文件。 | |||||
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论