Method for reclamation of an ellipsoid rock dump with an environmentally friendly orientation, involves forming of external slopes of tiers of ellipsoid dump with reclamation along perimeter by sub-tiers of 5-7 m
2024-04-10
专利权人GALAYKO V V (GALA-Individual) ; ZENKOV I V (ZENK-Individual)
申请日期2024-04-10
专利号RU2830665-C1
成果简介NOVELTY - Method of recultivation of rock ellipsoid shape of dump relates to mining, in particular, to development of deposits by open method and restoration of territories disturbed by mining operations. Method includes preparation of the lower base of the dump body along the terrain, laying of wastes into the dump, formation of external slopes of tiers of an ellipsoid dump with reclamation along the perimeter by sub-tiers of 5-7 m and with slope angles in range of 18-22° with the slope of the sites towards the dump body, their coverage with a fertile soil layer (FSL), followed by sowing herbs and planting seedlings. Preparation of the lower base of the body of the dump on the terrain is made by removing the FSL with a bulldozer for optimal entry along the dump boundary and its laying into the permanent storage along the perimeter next to the designed ellipsoid dump. USE - Mining. ADVANTAGE - Improving ecological efficiency of recultivated rock dump.
IPC 分类号A01B-079/02 ; E21C-041/32
国家俄罗斯
专业领域农业科学
语种英语
成果类型专利
文献类型科技成果
条目标识符http://119.78.100.226:8889/handle/3KE4DYBR/17272
专题中国科学院新疆生态与地理研究所
作者单位
1.GALAYKO V V (GALA-Individual)
2.ZENKOV I V (ZENK-Individual)
推荐引用方式
GB/T 7714
GALAYKO V V,ZENKOV I V. Method for reclamation of an ellipsoid rock dump with an environmentally friendly orientation, involves forming of external slopes of tiers of ellipsoid dump with reclamation along perimeter by sub-tiers of 5-7 m. RU2830665-C1[P]. 2024.
条目包含的文件
条目无相关文件。
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。